Friday, July 26, 2013

Download Fiat Installation Manual & Warranty Information PDF

PRODUCTS LTD One Piece Tub Shower Installation Manual & Warranty Information Acrylic Bathware by Fiat Products Ltd 255 Hutchings Street, Winnipeg, MB, R2X 2R4 Ph# 204-633-6122 Rev 05/03 Do not store units out of doors, Keep out of sunlight and exposure to moisture. Read instructions entirely before starting. These one-piece tub/shower enclosures are designed for new construction and are too big to fit through average openings, so move unit into installation area before framing is complete. Keep unit cartoned for protection, center on hand truck, and handle with care. A protective plastic has been applied to the front face of the unit. It is advised to leave this plastic on during installation to prevent the acrylic from scratching. A protective piece of cardboard, about the same size as the floor of the unit, should be cut from the cardboard face cover and placed within the bottom of the unit. The cardboard face cover should also be used after installation is complete to protect the unit during the construction period. If a fire rated alcove is required, approved finish material must be installed prior to unit installation. Access to drain and supply connections should be provided so that these connections may be made after the unit has been installed. All plumbing and electrical shall be installed in accordance with inspection authority requirements and local codes by qualified personnel. Check and verify all dimensions WHIRLPOOL PUMPS SHALL HAVE GROUND FAULT CIRCUIT PROTECTION (SUPPLIED BY OTHERS) WHICH WILL PROVIDE ADDITIONAL PROTECTION AGAINST LINE-TOGROUND SHOCK HAZZARD. A 120V, 20 amp., 60 Hz. SEPARATE CIRCUIT IS REQUIRED. All statements, technical information, and recommendations contained herein are based on tests we believe to be reliable; but the accuracy or completeness thereof is not guaranteed, and the following is made in lieu of all warranties, expressed or implied. Neither seller nor manufacturer shall be liable for any injury, loss or damage, direct or consequential, arising out of the use of or the inability to the product. Before using, the user shall determine the suitability of the product fo the intended use and user assumes all risk and liability whatsoever in connection therewith. No statement or recommendation contained herein shall have any force or effect, unless it is in an agreement signed by officers of seller or manufacturer.

The framing procedure can be used with either wood or metal studs. If Metal studs are used it may be necessary to stiffen the metal studs supporting the screw the flange of unit with wood inserts. 1. Before framing is started, check level and quality of floor. Make sure sub-floor is sturdy and level. 2. Rough in 2” x 4” studs at standard room height to dimensions shown in Diagram 1. The studding across the top front of the tub shower should be installed after installation of the unit. See note below for units with whirlpool systems. 3. Check framed-in area for proper size and ensure studding is straight, square and plumb. 4. Provide a hole in the floor to permit clearance for drain connection. For Model 6200 and 6035 locate to dimensions shown on Diagram 1. For model 377 locate to dimensions shown in Diagram 3. 5. Install plumbing tree within framing, by using measurements from diagram 2. Measurements are taken from the front end of the studs that were installed to accommodate the screw flange. NOTE: On the 6035 series models, we recommend the use of a single lever fitting. The installation of twin valve 8" (203mm) spread fitting requires the holes to be drilled offset. This would mean that the shower head and 8" (203mm) fitting will not be inline with the waste and overflow. Check plumbing for any leaks.

>>>Get The File | PDF Manual | Download here